The Mobile Launcher Platform or MLP is one of three two-story structures used by NASA to support the Space Shuttle stack during its transportation from the Vehicle Assembly Building (VAB) to Launch Pad 39-A at the Kennedy Space Center as well as serve as the vehicle’s launch platform. NASA’s three MLPs were originally constructed for the Apollo Program to launch the Saturn V rockets in the 1960s and 1970s, and have remained in service to this day, with substantial alterations.
The John F. Kennedy Space Center (KSC) is the NASA installation that has been the launch site for every United States human space flight since 1968. Although such flights are currently on hiatus, KSC continues to manage and operate unmanned rocket launch facilities for America’s civilian space program from three pads at the adjoining Cape Canaveral Air Force Station. Its iconic Vehicle Assembly Building (VAB) is the fourth-largest structure in the world by volume and was the largest when completed in 1965. Since December 1968, all launch operations have been conducted from Pads A and B at Launch Complex 39 (LC-39). Both pads are on the ocean, 3 miles (5 km) east of the VAB. From 1969–1972, LC-39 was the departure point for all six Apollomanned Moon landing missions using the Saturn V, the largest and most powerful operational launch vehicle in history, and was used from 1981–2011 for all Space Shuttle launches. The Shuttle Landing Facility, located just to the north, was used for most Shuttle landings and is among the longest runways in the world. Missions to the Moon required the large three-stage Saturn V rocket (111 m high and 10 m in diameter). At KSC, Launch Complex 39 (LC-39) was built on Merritt Island to accommodate the new rocket. Construction of the $800 million project began in November 1962. LC-39 pads A and B were completed by October 1965 (a planned Pad C was canceled), the VAB was completed in June 1965, and the infrastructure by late 1966. The complex included a hangar capable of holding four Saturn Vs, the VAB (130 million ft³); a transporter capable of carrying 5,440 tons along a crawlerway to either of two launch pads; and a 446-foot (136 m) mobile service structure. Three Mobile Launcher Platforms, each with a fixed launch umbilical tower, were also built. LC-39 also includes the Launch Control Center and a news media site.
From 1967 through 1973, there were 13 Saturn V lift-offs, including the ten remaining Apollo missions after Apollo 7. The first of three unmanned flights, Apollo 4 (Apollo-Saturn 501) on November 9, 1967, was also the first rocket launch from KSC itself. The Saturn V’s first manned launch on December 21, 1968 was Apollo 8′s lunar orbiting mission. The next two missions tested the Lunar Module: Apollo 9 (earth orbit) and Apollo 10 (lunar orbit). Apollo 11, launched from Pad A on July 16, 1969, made the first Moon landing on July 20. Apollo 12 followed four months later.